| ACW-2023-SOG-D-49-WID1973 |
2024-09-17 - Inspection - by OROGO - Cameron D-49 (WID 1973) - OROGO Well Abandonment Verification Inspection Summary Report.pdf |
|
|
Expired |
| ACW-2022-SOG-I-74-WID1792 |
2024-09-18 - Inspection - by OROGO - Cameron I-74 (WID 1792) - OROGO Well Abandonment Verification Inspection Summary Report.pdf |
|
|
Expired |
| ACW-2022-SOG-B-25-WID1756 |
2024-09-18 - Inspection - by OROGO - Cameron B-25 (WID 1756) - OROGO Well Abandonment Verification Inspection Summary Report.pdf |
|
|
Expired |
| ACW-2021-PPR-L-68-WID1207 |
2024-09-13 - Inspection - by PPR - CFOL Ft Liard L-68-60-20-123-45 Well Inspection Report incl GM Testing.pdf |
|
|
Approved |
| ACW-2021-IMP-B-48-WID0448 |
2024-09-23 - Inspection - by Imperial - Gas Migration - B-48 2024 Gas Detection Survey Report.pdf |
|
|
Approved |
| ACW-2022-MGM-M-17-WID1970 |
2024-07-15 - Inspection - by MGM - MGM Nogha M-17 WID1970 Well Inspection and GM Test Report 15-July-2024.pdf |
|
|
Expired |
| ACW-2019-018-MGM-C-49-WID1934 |
2024-07-15 - Inspection - by MGM - MGM Nogha C-49 WID1934 Well Inspection and GM Test Report 15-Jul-2024.pdf |
|
|
Expired |
| ACW-2019-017-MGM-K-14-WID2006 |
2024-07-15 - Inspection - by MGM - MGM West Nogha K-14 WID2006 Well Inspection and GM Test Report 15-July-2024.pdf |
|
|
Expired |
| ACW-2022-MGM-I-78-WID2078 |
2024-07-16 - Inspection - by MGM - Post-Abandonment - MGM Shell East I-78 WID 2078 ABD Site Photos July 16, 2024.pdf |
|
|
Expired |
| ACW-2022-MGM-E-35-WID2021 |
2024-07-16 - Inspection - by MGM - Paramount Lac Maunoir E-35 WID2021 Well Inspection and GM Test Report 16-July-2024.pdf |
|
|
Expired |